首页|装配式T梁翼板后张法预应力交叉连续梁柱节点施工关键技术

装配式T梁翼板后张法预应力交叉连续梁柱节点施工关键技术

扫码查看
公开了一种装配式T梁翼板后张法预应力交叉连续梁柱节点建造新技术,在装配式混凝土梁柱节点处采用板下一体化叠合T梁翼板端预应力张拉技术,有效改善了梁柱节点受力特性,节点抗负弯矩效果好,预应力梁柱增强节点抗震能力强.采用有限元软件ABAQUS对"低标准,提前张拉""超标准,控制张拉"两种工况下节点进行优化施工模拟.由分析结果可知:当梁侧加腋板底张拉节点只有柱侧双边张拉时,在保障结构安全的前提下,可在混凝土凝结硬化达到混凝土设计强度的 75%时进行张拉;当梁侧加腋板底张拉节点为三边或四边张拉时,在混凝土凝结硬化达到混凝土设计强度的 85%时进行张拉;整体技术方案较常规技术可节省 45%左右的吊装工期,节点抗震效果更好,成本降低 20%左右,有效简化了施工工艺,整体装配建造新技术符合"绿色建造"规范要求.
Key construction technologies of prefabricated T-beam flange post-tensioned prestressed cross-continuous beam-column joint
A new construction technology of prefabricated T-beam flange post-tensioned prestressed cross-continuous beam-column joint was disclosed.The pre-stressed tensioning technology of the integrated composite T-beam flange end under the plate was adopted at the prefabricated concrete beam-column joints,which effectively improves the mechanical characteristics of the beam-column joints,the anti-negative bending moment effect of the joints is good,and the seismic capacity of the prestressed beam-column reinforced joints is enhanced.The finite element software ABAQUS was used to optimize the construction simulation of the joints under the two working conditions of"low standard,early tension"and"super standard,controlled tension".The analysis results show that when the beam side and the bottom tension joint of the axillary plate are only tensioned on the column side,under the premise of ensuring the safety of the structure,it can be tensioned when the concrete condensation hardening reaches 75%of the design strength of the concrete.When the tension joint at the bottom of the axillary plate on the side of the beam is tensioned on three or four sides,it can be tensioned when the concrete condensation hardening reaches 85%of the design strength of the concrete.The overall technical scheme can save about 45%of the hoisting period compared with the conventional technology.The seismic effect of the joint is better,the cost is reduced by about 20%,and the construction process is effectively simplified.The new technology of overall assembly and construction meets the requirements of"green construction"specification.

prefabricated concrete structureT-beam flangeprestressed cross-continuous beamconstruction technologyoptimized construction simulation

高路恒、张太玥、周峰、徐卫星、王斯海

展开 >

江苏工程职业技术学院,南通 226007

南京工业大学交通运输工程学院,南京 211816

南通四建集团有限公司,南通 226399

装配式混凝土结构 T梁翼板 预应力交叉连续梁 施工工艺 优化施工模拟

2023南通市科技计划项目2023南通市科技计划项目

MSZ2023035JCZ2023032

2024

建筑结构
中国建筑设计研究院 亚太建设科技信息研究院 中国土木工程学会

建筑结构

CSTPCD北大核心
影响因子:0.723
ISSN:1002-848X
年,卷(期):2024.54(16)
  • 13