Metro engineering has the characteristics of high investment,multiple specialties,multiple processes and tight design cycles.The application of BIM forward design can fully leverage the advantages of BIM design,save design cycle,control cost and improve project quality.However,in the actual project,due to the constraints of many factors,the application of BIM forward design in subway station project has many difficulties,such as high cost,poor data and low design efficiency.Taking the Yanta South Road Station of Xi'an Metro Line 8 as an example,the application of full professional BIM forward design in this project was explored.By introducing the application of BIM forward design in several aspects such as enclosure structure,traffic guidance improvement and full professional BIM forward design,the advantages of BIM forward design in practical projects were demonstrated.At the same time,effective ways to promote BIM forward design were proposed,which include formulating relevant BIM design standards,developing corresponding auxiliary design software,and promoting the participation of all professionals in BIM forward design.
building information modelingforward designsubway stationRevit software