ANALYSIS OF CONTROL KEY POINTS IN MEASUREMENT AND CONTROL PROCESS OF CABLE-STAYED BRIDGE
Based on the Qiliang Road project of the Beijing Hangzhou Grand Canal South Extension Project of the Nanjing Branch of the Danyang BT Phase Ⅱ,the construction control and precautions for cable-stayed bridge measurement were introduced.Elaborated on the measurement and setting out of cable-stayed bridges,process control,practical operation and experience,as well as factors affecting bridge measurement and control were introduced.These contents can provide a certain reference for the measurement and control of similar cable-stayed bridges in the future.
cable-stayed bridgemeasurement constructioncontrol factorsurveying and setting out