苏州中南中心逆作法超深基坑BIM技术应用
APPLICATION OF BIM TECHNOLOGY IN REVERSE METHOD ULTRA-DEEP FOUNDATION PIT IN SUZHOU ZHONGNAN CENTER
王帅亮 1陈川 1宗秀金 1钟世 1刘春洋 1万周全1
作者信息
- 1. 江苏中南建筑产业集团有限责任公司,226100,江苏南通
- 折叠
摘要
苏州中南中心项目地下室为典型的大面积软土地基超深基坑,在施工过程中面临结构复杂、施工节点多样、各项工序衔接紧密、协调难度大、各流水段施工推演多变的问题,利用BIM技术通过展现、调整、再展现,生动形象地指导现场施工,保证了深基坑工程施工过程的安全高效.
Abstract
The basement of Suzhou Zhongnan Center Project is a typical large-area soft soil foundation and ultra-deep foundation pit.During the construction process,it faced complex structure,various construction nodes,close connection of various processes,difficult coordination,and variable construction deduction in each flow section.Using BIM technology to guide the on-site construction vividly and vividly through the use of BIM technology to ensure the whole process of construction of the deep foundation pit project safely and efficiently.
关键词
超高层深基坑/复杂节点/BIM技术/逆作施工Key words
super high rise deep foundation pit/complex node/BIM technology/reverse construction引用本文复制引用
出版年
2023