THE APPLICATION OF LIGHT STEEL KEEL PARTITION IN LARGE GYMNASIUM
In the high-rise buildings construction,because of its vertical superposition of the space,make a lot of elevators are concentrated in the core tube area and therefore must be equipped with a large number of wells and wind well.In the partition wall construction process,according to the traditional block structure partition wall construction technology for secondary plaster,and in the shaft is equipped with the frame body,but if the frame body build number greater than a certain standard deviation,it is easy to form various security hidden danger,cause serious damage to the whole of high-rise building construction safety.Based on the actual case as the main research object,the light steel keel partition technology applied to the large gym shaft wall construction,effectively solve the problems that exist in the traditional partition wall construction.