STUDY ON OPTIMIZATION OF PUMP STATION ENGINEERING MANAGEMENT BASED ON PDCA CYCLE QUALITY CONTROL
It is difficult to control the quality of pump station construction due to the impact of geological conditions and other factors.A method for optimization of pump station engineering management based on PDCA cycle quality control was proposed in this study and applied in engineering projects.Taking Lot in in the pump station construction involving rainwater,sewage and drainage in the north of China-Singapore Tianjin Eco-city as an example,difficulties in engineering quality management were analyzed.On this basis,a quality control method based on the PDCA cycle was proposed.A mechanism for fusion of the cyclic theory and three-stage approach was developed based on the advantages of theoretical methods.Quality control measures were proposed for key processes in actual construction.It was found by construction data comparison that this method has significant effects in terms of construction quality,progress and cost control.The analysis of local theoretical methods and application in engineering cases provide a reference for construction projects in the future.