STUDY ON DYNAMO AND CIVIL 3D COORDINATION FOR HIGH EFFICIENCY OF PILE FOUNDATION CONSTRUCTION
In this study on Dynamo and Civil 3D coordination,key points for rapid modeling with the two types of software were summarized.In addition,the BIM technology was used to quickly check the pile foundation in a gully rock base under complex geological conditions and thus determine the pile length in advance.On this basis,steel cages were prefabricated and the concrete plan was proposed accurately.Meanwhile,BIM visualization was adopted to facilitate drilling of the pile foundation,thus effectively ensuring the drilling quality of the pile foundation and fully improving the efficiency of pile foundation construction.