首页|5m低净空工况基坑支护开挖施工与实测研究

5m低净空工况基坑支护开挖施工与实测研究

扫码查看
以苏州市轨道交通某地铁车站基坑为例,阐述了5m低净空工况下采取钻孔灌注桩+MJS工法桩施作基坑围护结构与低净空基坑分区开挖的施工工艺.通过实测分析围护结构变形、邻近高架桥墩台沉降、地表沉降变化、支撑轴力变化、水位变化的发展规律.结果表明:盖板下基坑部分自开始开挖至坑底,钻孔灌注桩最大侧向位移值呈增大趋势,最大侧向位移点位置深度随开挖深度逐渐下移至开挖深度的 1.1 倍处.随着基坑开挖位置逐渐远离桥墩台,墩台竖向位移变化量逐渐减小,同时基坑背面一侧地表沉降未出现较大变化,显而易见,桥桩桩身周围的隔离桩有效隔离了坑外地表沉降,支撑轴力变化随基坑开挖深度增加显现即时性特点.此外,基坑东北角潜水位一直低于预警值,但未见明显渗漏情况.证明 5 m低净空工况下基坑采取地下连续墙结合钻孔灌注桩围护结构及MJS止水帷幕的施工方案具有合理性.
STUDY ON EXCAVATION AND MEASUREMENT OF FOUNDATION PIT SUPPORT WITH LOW CLEARANCE OF 5M
Taking the foundation pit of a subway station of the urban rail transit in Suzhou as an example,the construction process was described for the foundation pit enclosure with bored piles+MJS piles with the low clearance of 5m and the zone-based foundation pit excavation with low clearance.Through measurement,the law of enclosure deformation,pier and abutment settlement of adjacent viaducts,changes in surface settlement,changes in supporting axial force and changes in water level were analyzed.Results have shown that when the foundation pit under the cover was excavated from top to bottom,the maximum lateral displacement of bored piles increased,and the site where the maximum lateral displacement occurred at 1.1 times the excavation depth.As the foundation pit was excavated far and far from the bridge pier and abutment,the vertical displacement of the pier and abutment decreased gradually,while the surface settlement on the back side of the foundation pit increased greatly.Obviously,the surface settlement outside the foundation pit was effectively isolated by shelter piles around bridge piles,and the supporting axial force changed instantly with the pit excavation depth increasing.Furthermore,the groundwater level in the northeast corner of the foundation pit was always below the warning level,but without obvious leakage.This study has proven that the construction scheme involving underground diaphragm walls,bored piles and MJS waterproof curtains was reasonable for foundation pits with low clearance of 5 m.

5 m clearancefoundation pit excavationsettlementchange in water level

黎兴望、詹炎培、杨平、魏领先、张婷

展开 >

中铁二局第五工程有限公司,408403,成都

南京林业大学土木工程学院,210037,南京

5m净空 基坑开挖 沉降 水位变化

2025

建筑技术
北京建工集团有限责任公司

建筑技术

影响因子:1.262
ISSN:1000-4726
年,卷(期):2025.56(1)