In the hospital reconstruction and expansion project,the existing medical work can not stop,need to complete the reconstruction and expansion construction as soon as possible,as far as possible to reduce the interference to the normal operation of the hospital,the traditional reinforced concrete structure is difficult to meet the above requirements.Relatively speaking,the processing of the main components of the prefabricated steel structure system is completed in the factory,and the on-site installation and construction period is short,which has little influence on the surrounding disease care area and normal medical work.Through the development of a movable connection with the existing building adjustable height,it can meet the requirements of the hospital expansion project.
关键词
装配式钢结构/可调钢托座标高/活动连接
Key words
prefabricated steel structure/adjustable support elevation/active connection