首页|关于覆土卸载导致轨道交通结构上浮的研究

关于覆土卸载导致轨道交通结构上浮的研究

扫码查看
以某城市运营1年后的轨道交通隧道为例,在监测过程中发现隧道及道床结构出现上浮超过控制指标并有加大趋势,随后监测单位发布红色预警,同时加密了监测点及监测频率,后续对其变形进行了模拟和预测,并对其进行了预警分析.运营管理单位在接到预警后启动了应急预案后,迅速组织召开预警分析会,并采取了相应的处置措施.
STUDY ON THE FLOATING OF RAIL TRANSIT STRUCTURE CAUSED BY OVERBURDEN UNLOADING
Taking a rail transit tunnel in a city after one year of operation as an example,during the monitoring process,it was found that the tunnel and track bed structure appeared to rise above the control index and had an increasing trend,and then the monitoring unit issued a red warning,encrypted the monitoring point and monitoring frequency,and then simulated and predicted its deformation and carried out an early warning analysis.After receiving the early warning,the operation management unit launched the emergency plan,quickly organized the early warning analysis meeting,and took corresponding disposal measures.

urban rail transitoperation periodascent warning

陈维、刘健、陈文晓、韩守程、安育芳、张睿

展开 >

北京城建勘测设计研究院有限责任公司,北京 100101

城市轨道交通深基坑岩土工程北京市重点实验室,北京 100101

南宁轨道交通集团有限责任公司,南宁 530029

城市轨道交通 运营期 上浮预警

2024

建筑技术开发
北京市建筑工程研究院

建筑技术开发

影响因子:0.351
ISSN:1001-523X
年,卷(期):2024.51(1)
  • 1
  • 2