In super high-rise buildings,the core cylinder+outer frame structure is a common structure form,and the hydraulic climbing system is also used in the construction process to carry out the vertical and horizontal construction of the core cylinder.Based on the project of Tencent Guangzhou Headquarters building,according to the structural characteristics of the core tube,the design process of hydraulic climbing mold frame,steel template and embedded parts in the inner and outer core tube wall is described,and the specific design is carried out for the climbing mold climbing of the variable section wall,which effectively solves the problem of continuous climbing mold climbing,and is applied well in the construction process of the core tube.
关键词
超高层/核心筒/液压爬模/结构设计
Key words
super high-rise/core cylinder/hydraulic climbing die/structural design