建筑技术开发2024,Vol.51Issue(2) :68-70.

装配式后植锚固筋混凝土预制叠合板施工

CONSTRUCTION OF PREFABRICATED COMPOSITE CONCRETE PLATE WITH PREFABRICATED ANCHOR BARS AFTER INSTALLATION

文国民 陈龙 李龙
建筑技术开发2024,Vol.51Issue(2) :68-70.

装配式后植锚固筋混凝土预制叠合板施工

CONSTRUCTION OF PREFABRICATED COMPOSITE CONCRETE PLATE WITH PREFABRICATED ANCHOR BARS AFTER INSTALLATION

文国民 1陈龙 1李龙1
扫码查看

作者信息

  • 1. 中建安装集团有限公司华西公司,西安 710076
  • 折叠

摘要

为进一步探究装配式建筑施工作业中预制叠合板施工质量的提升路径,以某高层建筑预制叠合板施工存在的困难为研究切入点,选取后植锚固筋混凝土预制叠合板施工模式,并对该施工模式下的各个流程要点进行详细探究.从实际验收结果来看,本次优化后的施工模式有效解决了以往的技术难题,表明其具有一定的实际应用价值.

Abstract

In order to further explore the improvement path of the construction quality of prefabricated composite panels in prefabricated building construction operations,taking the difficulties in the construction of prefabricated composite panels in a high-rise building as the research entry point,the construction mode of precast composite panels with post planting anchor bars is selected,and the various process points under this construction mode are explored in detail.From the actual acceptance results,it can be seen that the optimized construction mode effectively solves previous technical problems,indicating that it has certain practical application value.

关键词

装配式建筑/后植锚固筋/预制叠合板

Key words

prefabricated buildings/post planting anchor bars/prefabricated laminated panels