槽式光热电站集热场施工难点与对策解析
ANALYSIS OF THE DIFFICULTIES AND COUNTERMEASURES IN THE CONSTRUCTION OF THE COLLECTOR FIELD OF PARABOLIC TROUGH SOLAR POWER PLANT
茅懋 1崔晓宁 1李所军1
作者信息
- 1. 中国船舶重工集团新能源有限责任公司,北京 100097
- 折叠
摘要
槽式光热电站集热场施工具有一定的特殊性,为确保集热场施工的质量与安全,应全面掌握与了解施工过程存在的重点、难点,再通过技术或管理措施加以解决.通过对现有槽式光热项目集热场施工的分析,全面复盘施工过程存在的问题,并为如何改进施工提出对策,确保电站整体建设质量可控.
Abstract
The construction of the colletor field of parabolic trough solar power plant has certain particularity.In order to ensure the quality and safety of the construction of the collector field,it is necessary to comprehensively grasp and understand the key points and difficulties in the construction process,and then solve them through technical or management measures.Based on the analysis of the construction of the collector field of the existing parabolic trough type solar power plant,the problems existing in the construction process are comprehensively reviewed,and countermeasures are proposed for how to improve the construction to ensure that the overall construction quality of the power station is controllable.
关键词
集热场/槽式光热电站/风险可视化Key words
collector field/slot type photothermal power plant/risk visualization引用本文复制引用