FACTORY PREFABRICATION CONSTRUCTION TECHNOLOGY OF DOUBLE-LAYER REINFORCING CAGE WITH LARGE PILE DIAMETER
The design of the non-traffic bridge of the Shenzhen-Middle Channel for 100 years.The basic layout of the large pile diameter drilling pile is arranged.Some of the reinforced cages are set with double-layer main tendons.High difficulty.After the application of double-layer reinforced cage in the large pile diameter of this project,the process is continuously optimized to form standardized construction.The quality and processing efficiency of the steel cage all achieve the expected goals.Through a series of large pile diameter double-layer reinforced cage factories,the prefabricated process of prefabrication process,forming a set of prefabricated processes that are different from traditional long-term method,solving the problem of prefabricated large and medium-sized processing plants in the prefabricated large pile diameter double-layer reinforced cage cage.
large pile diameterrdouble layersteel cageprefabrication