RESEARCH ON CONSTRUCTION TECHNOLOGY OF GLASS CURTAIN WALL IN HIGH RISE BUILDING ENGINEERING
To ensure the construction quality of glass curtain walls in high-rise building projects,this study takes Tianma Building as an example,combines the design situation of the building and the glass curtain wall design scheme,determines the construction process of glass curtain walls,and completes the construction of glass curtain walls according to standards.Under static pressure,the airtightness of the glass curtain wall was tested using a detec-tion device.The test results showed that the construction technology used in the study had good construction effects and could ensure the airtightness of the glass curtain wall.After the test,the overall air permeability of the glass cur-tain wall was 32.62 m3/h,and the unit area air permeability was 0.35 m3/(h·m-2).
high-rise building engineeringglass curtain wallairtightness