首页|下穿既有高架桥预制箱梁吊装施工技术研究

下穿既有高架桥预制箱梁吊装施工技术研究

扫码查看
随着城市交通建设的快速发展,新建线路与既有线路的交叉不可避免.在下穿和跨越既有线路时箱梁吊装成为一个重要的关键节点,合理布置箱梁吊装可以确保项目安全、高效进行.研究以北京市某改造项目为例,分析了该工程的技术难点,对新建立交匝道下穿昌平线箱梁吊装工程进行分析与总结,研究结果可为类似项目提供工程经验.
RESEARCH ON HOISTING CONSTRUCTION TECHNOLOGY FOR PREFABRICATED BOX GIRDERS OF UNDERPASS EXISTING ELEVATED BRIDGES
With the rapid development of urban transportation construction,the intersection of new and existing lines is inevitable.The hoisting of box girders has become an important critical node when crossing and crossing existing lines.Reasonable arrangement of box girder hoisting can ensure the safe and efficient progress of the project.Taking a renovation project in Beijing as an example,this study analyzed the technical difficulties of the project and summarized the lifting of box girders under the newly-built overpass ramp crossing Changping Line.The research results can provide engineering experience for similar projects.

box girder hoistingunderpass existing elevatedrapid transformation of existing lines

郭水、王建、夏阳、王利辉

展开 >

北京市政建设集团有限责任公司,北京 100045

北京工业大学城市建设学部,北京 100124

箱梁吊装 下穿既有高架 既有线路快速化改造

2024

建筑技术开发
北京市建筑工程研究院

建筑技术开发

影响因子:0.351
ISSN:1001-523X
年,卷(期):2024.51(5)
  • 7