近年来,随着城市快速发展,紧邻城市高架桥进行深基坑的施工活动有明显增多趋势.城市高架桥变形受基坑地质条件、开挖方式、支护方案等因素影响.以南京某地铁车站深基坑工程为依托,通过建立三维空间模型,研究深基坑开挖对邻近既有市政快速路高架桥变形的影响,并将计算结果与现场监测数据进行对比分析,结果表明围护方案合理可行,满足市政快速路高架桥运营期间变形控制要求.相关成果可为今后类似工程提供参考借鉴.
ANALYSIS OF THE IMPACT OF DEEP EXCAVATION CONSTRUCTION ON THE DEFORMATION OF ADJACENT MUNICIPAL EXPRESSWAY ELEVATED BRIDGES
In recent years,with the rapid development of cities,there has been a significant increase in the construction activities of deep foundation pits adjacent to urban elevated bridges.The deformation of urban elevated bridges is influenced by various factors such as geological conditions of foundation pits,excavation methods,and support schemes.Based on the deep foundation pit project of a subway station in Nanjing,a three-dimensional spatial model was established to study the impact of deep foundation pit excavation on the deformation of adjacent existing municipal expressway viaducts.The calculation results were compared and analyzed with on-site monitoring data.The results showed that the enclosure scheme was reasonable and feasible,meeting the deformation control requirements during the operation of municipal expressway viaducts.The relevant achievements can serve as a reference for similar projects in the future.

deep foundation pitelevated bridgedeformation effectfinite element analysis

邓思远

展开 >

中铁大桥勘测设计院集团有限公司,武汉 430101

深基坑 高架桥 变形影响 有限元分析

2024

建筑技术开发
北京市建筑工程研究院

建筑技术开发

影响因子:0.351
ISSN:1001-523X
年,卷(期):2024.51(5)