首页|EPC装配式高层房建项目全专业穿插施工关键技术分析

EPC装配式高层房建项目全专业穿插施工关键技术分析

扫码查看
分析梅溪湖某项目在EPC模式下穿插施工的关键技术应用.EPC(工程、采购、建造)模式通过整合设计、采购、施工及测试阶段,为项目实施提供了较全面的管理策略.首先概述项目的基本情况,包括其结构、规模和关键时间节点,然后探讨EPC合同结构、管理流程以及项目风险管理和质量控制策略.通过对梅溪湖某项目实施过程的深入分析,总结了穿插施工法的成功经验,并提出了面临的主要问题与挑战.最后,针对项目管理提出一系列的建议,以期为未来类似项目的规划与执行提供参考.
EPC ASSEMBLY HIGH-RISE HOUSE CONSTRUCTION PROJECT ALL PROFESSIONAL INTERSPERSED CONSTRUCTION KEY TECHNOLOGY ANALYSIS
Analyze the key technical applications of a project in Meixi Lake in the EPC mode of interspersed construction.The EPC(Engineering,Procurement,Construction)model provides a comprehensive management strategy for project implementation by integrating the design,procurement,construction,and testing stages.Firstly,provide an overview of the project's basic situation,including its structure,scale,and key timeline.Then,explore the EPC contract structure,management process,as well as project risk management and quality control strategies.Through in-depth analysis of the implementation process of a project in Meixi Lake,the successful experience of the interspersed construction method was summarized,and the main problems and challenges faced were proposed.Finally,a series of suggestions are proposed for project management,in order to provide reference for the planning and execution of similar projects in the future.

EPC modeinterspersed constructionproject managementrisk management

迟骋、丁雅鑫、彭鹏、罗成志、林畅宇、肖君彦

展开 >

中建二局第一建筑工程有限公司,北京 100176

EPC模式 穿插施工 项目管理 风险管理

中建二局第一建筑工程有限公司资助课题

cscec2b1c-230031

2024

建筑技术开发
北京市建筑工程研究院

建筑技术开发

影响因子:0.351
ISSN:1001-523X
年,卷(期):2024.51(6)
  • 8