RESEARCH ON CONSTRUCTION TECHNOLOGY AND TECHNOLOGY OF RAFT JUMPING METHOD FOR FULLY PAVED BASEMENT FOUNDATION
The construction of mass concrete by skip warehouse method is a new construction technology that cancels the setting of post pouring belt,and can effectively reduce the concrete cracks.Combined with the construction technology of super large volume concrete skip method for the basement foundation raft of one project,this paper analyzes the skip method construction technology from the advantages of the scheme,process flow,quality control points and other elements.It is proved that compared with the construction of post cast strip,the skip warehouse method has the advantages of less construction difficulty,less construction period and economic benefits.