STUDY ON THE SOFT LAND FOUNDATION TREATMENT SCHEME OF QUANZHOU BAY AVENUE
In this study,we analyzed the geological situation of the project,the distribution of soft foundation section and the soil parameters through the engineering case of Quanzhou Bay Avenue,and selected the soft foundation treatment scheme from the commonly used shallow,middle and deep soft foundation treatment methods.The technical feasibility of each scheme is fully compared by means of foundation treatment calculation,slope stability analysis and settlement analysis.On the basis of technical feasibility,through the comprehensive comparison of the aspects of construction feasibility and project investment,the optimal scheme adapted to the different depths of the project.At the same time,a special treatment is given for the special section location of the soft foundation.While controlling the total settlement,the differential settlement of the transition special position enables the design scheme to achieve good treatment effect and meet the design requirements.
subgrade treatmentsoft land foundationcement mixing pileprestressed thin-wall pipe pile