超高层核心筒液压爬模施工技术研究
RESEARCH ON HYDRAULIC CLIMBING CONSTRUCTION TECHNOLOGY OF SUPER TALL CORE CYLINDER
寿波1
作者信息
- 1. 中建四局建设发展有限公司,福建厦门 361000
- 折叠
摘要
爬模在施工过程中,整个体系受力复杂,故存在各类安全隐患问题.研究以厦门某工程为例,主要探讨了液压爬模施工中的3个问题:核心筒变截面、剪力墙内缩以及加强层钢托座外伸.针对以上3点问题提出了3套解决方案:爬模高空拆除安装、斜爬技术以及翻板开洞技术.经工程验证,研究所提出的方案可以较好地解决超高层结构液压爬模施工时所遇到的上述问题,以期为以后的施工提供新思路.
Abstract
In the construction process,the force of the whole system is complicated,and various problems may be encountered.Taking a project in Xiamen as an example,the paper mainly discusses three problems in the construction of hydraulic climbing mold:variable section of the core cylinder,internal shrinkage of the shear wall and the extension of the steel bracket of the reinforced layer.In view of the above three problems,three sets of solutions are proposed:high-altitude demolition and installation of climbing mold,oblique climbing technology and flipping plate opening technology.Through engineering verification,the proposed scheme can better solve the above problems encountered in the construction of super tall structure hydraulic climbing form,and provide a new idea for the construction in the future.
关键词
液压爬升模板/超高层/钢框架-核心筒Key words
hydraulic climbing formwork/super high-rise/steel frame-core cylinder引用本文复制引用
出版年
2024