RESEARCH ON HYDRAULIC CLIMBING CONSTRUCTION TECHNOLOGY OF SUPER TALL CORE CYLINDER
In the construction process,the force of the whole system is complicated,and various problems may be encountered.Taking a project in Xiamen as an example,the paper mainly discusses three problems in the construction of hydraulic climbing mold:variable section of the core cylinder,internal shrinkage of the shear wall and the extension of the steel bracket of the reinforced layer.In view of the above three problems,three sets of solutions are proposed:high-altitude demolition and installation of climbing mold,oblique climbing technology and flipping plate opening technology.Through engineering verification,the proposed scheme can better solve the above problems encountered in the construction of super tall structure hydraulic climbing form,and provide a new idea for the construction in the future.