滨海吹填土软弱地基多工法联合处理施工控制措施研究
RESEARCH ON CONSTRUCTION CONTROL MEASURES FOR MULTI METHOD JOINT TREATMENT OF SOFT FOUNDATION IN COASTAL RECLAMATION
张佳佳1
作者信息
- 1. 隧道股份上海城建市政工程(集团)有限公司,上海 200065
- 折叠
摘要
大面积高精度厂房软基处理对施工方法及控制措施要求较高,因此,研究基于滨海精密厂房吹填土软基处理项目,对两种软弱地基处理方案进行了技术、经济层面的对比,选择了管井降水+强夯+石灰土层多工法联合处理方案,并对多工法施工工艺及施工控制措施进行了总结.通过单桩竖向抗压静荷载试验,试验点的复合地基承载力极限值为130 kPa,其符合设计要求,除此还验证了多工法施工方案及控制措施的有效性.
Abstract
The soft foundation treatment of large-area high-precision factory buildings requires high requirements for construction methods and control measures.Therefore,based on the coastal precision factory building reclamation soil soft foundation treatment project,a comparative analysis was conducted on two soft foundation treatment schemes at the technical and economic levels.A multi construction method joint treatment scheme of pipe well dewatering,dynamic compaction,and lime soil layer was selected,and the multi construction technology and construction control measures were summarized.Through the vertical compressive static load test of a single pile,the ultimate bearing capacity of the composite foundation at the test pile point is 130 kPa,which meets the design requirements.In addition,the effectiveness of the multi construction method and control measures has been verified.
关键词
滨海吹填土/软弱地基/多工法/施工控制Key words
coastal dredger fill/soft foundation/multi-construction method/construction control引用本文复制引用
出版年
2024