首页|5.5m层高公共建筑铝模与盘扣综合施工技术研究

5.5m层高公共建筑铝模与盘扣综合施工技术研究

扫码查看
为了解决层高5.5 m的办公楼应用铝模,避免高大铝模施工安全隐患,因此采用5.5 m层高公共建筑铝模与盘扣综合施工技术,经过首次安装及过程中的深化,整体结果显示,此支撑体系较传统架体具有更好的安全性能,在安全、质量、进度、环保等方面都得到了较大的提升.
RESEARCH ON COMPREHENSIVE CONSTRUCTION TECHNOLOGY OF 5.5-METER-HIGH ALUMINUM FORMWORK AND PLATE BUCKLES FOR PUBLIC BUILDINGS
In order to solve the application of aluminum formwork in office buildings with a height of 5.5 meters and avoid safety hazards in the construction of tall aluminum formwork,a comprehensive construction technology of 5.5 meters high public building aluminum formwork and buckle is adopted.After the first installation and deepening of the process,the overall results show that this support system has better safety performance than traditional scaffolding,and has been greatly improved in terms of safety,quality,progress,and environmental protection.

aluminum moldfrogcombine

周力、贾林、曹刚、严美、张睿奕

展开 >

中建二局第三建筑工程有限公司,北京 100070

铝模 盘扣 结合

2024

建筑技术开发
北京市建筑工程研究院

建筑技术开发

影响因子:0.351
ISSN:1001-523X
年,卷(期):2024.51(10)