高填方路堤由于填筑高度较高,施工难点之一就是控制其工后沉降.为研究高填路堤沉降控制技术,以某高速公路高填方路堤为对象开展研究.通过计算理论沉降值和实际沉降监测数据对比、分析,验证了高填路堤沉降控制技术的有效性,从而得到了高填路堤相关沉降控制技术要点.
Abstract
Because of the high filling height,one of the difficulties in construction is to control the settlement after construction.In order to study the settlement control technology of high fill embankment,a highway high fill embankment was studied.Through the comparison and analysis of theoretical settlement value and actual settlement monitoring data,the effectiveness of settlement control technology of high fill embankment was verified,and the key points of relevant settlement control technology of high fill embankment were obtained.
关键词
高填路堤/工后沉降/沉降监测/冲击补强Key words
high fill embankment/post construction settlement/settlement monitoring/impact reinforcement引用本文复制引用