There is a deep foundation pit in a municipal project,its depth is 25.1 m,the area is soft soil,in which the water content of the water barrier is high.Due to the limited precipitation effect of conventional precipitation schemes,it is necessary to put forward a precipitation scheme according to the actual situation of the site in the precipitation construction,and optimize the precipitation scheme through BIM technology.
关键词
降水/管井/软土基坑/BIM优化设计
Key words
precipitation/tube well/soft soil foundation pit/BIM optimization design