CASE STUDY ON DEWATERING CONSTRUCTION OF DEEP FOUNDATION PIT PIPE WELL IN COASTAL SOFT SOIL AREA
There is a deep foundation pit in a municipal project,its depth is 25.1 m,the area is soft soil,in which the water content of the water barrier is high.Due to the limited precipitation effect of conventional precipitation schemes,it is necessary to put forward a precipitation scheme according to the actual situation of the site in the precipitation construction,and optimize the precipitation scheme through BIM technology.
precipitationtube wellsoft soil foundation pitBIM optimization design