建筑机械2024,Issue(2) :22-25.DOI:10.14189/j.cnki.cm1981.2024.02.026

盾构机械施工过程中的风险评估与管理研究

Research on risk assessment and management in shield machine construction process

寇宏宇
建筑机械2024,Issue(2) :22-25.DOI:10.14189/j.cnki.cm1981.2024.02.026

盾构机械施工过程中的风险评估与管理研究

Research on risk assessment and management in shield machine construction process

寇宏宇1
扫码查看

作者信息

  • 1. 中铁十九局集团轨道交通工程有限公司,北京 100000
  • 折叠

摘要

随着城市地下基础设施的快速发展,盾构机械施工作为隧道工程中的重要方法得到了广泛应用.然而,施工过程中的各种风险因素也随之增多,如何准确评估和有效管理这些风险已成为行业的焦点.本研究采用模糊综合评价法,对盾构机械施工过程中的风险进行了系统的评估,并提出了相应的管理策略.结果表明,通过模糊综合评价法可以更为准确地识别和评估施工风险,从而为风险管理提供有力支持.

Abstract

With the rapid development of urban underground infrastructure,shield machine construction has been widely used as an important method in tunnel engineering.However,various risk factors in the construction process have also increased.How to accurately assess and effectively manage these risks has become the focus of the industry.In this study,the fuzzy comprehensive evaluation method is used to systematically evaluate the risks in the construction process of shield machinery,and the corresponding management strategies are proposed.The results show that the fuzzy comprehensive evaluation method can more accurately identify and evaluate the construction risk,thus providing strong support for risk management.

关键词

盾构机械/风险评估/模糊综合评价法/风险管理

引用本文复制引用

出版年

2024
建筑机械
北京建筑机械研究所

建筑机械

影响因子:0.245
ISSN:1001-554X
参考文献量7
段落导航相关论文