The curtain wall unit of super-high-rise building is a very common form of building structure,which is widely used in the current high-end construction projects.In this paper,taking the hoisting construction of a super-high-rise unit of a commercial office building as an example,the frame-type curtain wall design structure is used and the hoisting dynamic parameters of the super-high-rise unit are calculated.The super-high-rise unit is hoisted and installed according to the hoisting technical requirements of the super-high-rise unit.The experimental results show that the proposed method has a short hoisting time of the super-high-rise unit and can effectively improve the actual construction efficiency.
super-high-riseunit bodyhoisting technologyinstallation and construction