In bridge engineering projects,the prestressed concrete continuous beam construction method can greatly improve the stability and seismic resistance ability of the main structure of bridge engineering,prolong the operating life of the bridge structure,and reduce the probability of disease risk.However,in the process of actual construction work of the bridge engineering projects,all factors may have a certain impact on the construction process.In this paper,the construction control points of prestressed concrete continuous beams are decomposed based on the analysis of construction technology,and the corresponding improvement process and technical measures are proposed,so as to provide reference for relevant personnel.
关键词
高速铁路/预应力/混凝土连续梁/施工控制
Key words
high-speed railway/prestressed/concrete continuous beam/construction control