摘要
当涉及建筑工程质量标准检测时,钻芯法是一种常用的方法.它通过钻取建筑结构中的混凝土或岩石样本,并对这些样本进行实验室测试,来评估其物理和力学特性.但在实际操作中,也有取样局限性、破坏性测试以及时间和成本等不足.因此,在建筑工程质量标准检测中应用钻芯法,要注意取样位置选择、实验室测试准确性以及结果解读和分析.
Abstract
For construction engineering quality standard detection,the core drilling method is a commonly used method.The concrete or rock samples in building structures are obtained by drilling and tested in the laboratory to evaluate their physical and mechanical properties.However,in practical operation,there are also sampling limitations,destructive testing,time,cost and other shortcomings.Therefore,when applying the core drilling method in the construction engineering quality standard detection,it is necessary to pay attention to the selection of sampling location,the accuracy of laboratory tests,and the interpretation and analysis of results.