Construction Method of High-Formwork Large-Load Floor Support System for Large-Span Preinstalled Equipment
In view of the problem that the vertical deformation is too large in the existing large-load floor construction,which affects the construction safety and stability,this paper carried out the research on the construction method of high-formwork large-load floor support system for large-span preinstalled equipment.The basic structure design of high formwork and floor support frame for long-span preinstalled equipment;The operation platform is set up by means of inclined tie bar+I-shaped steel support system,and the construction of embedded parts is completed;After ensuring that the formwork is installed,the concrete is poured;After the concrete is poured and cured,the operating platform is removed.These cases demonstrate that,after the application of new construction method,the vertical maximum deformation of the floor structure can be effectively controlled and the overall structural quality of the project can be improved.
large spanequipmentlarge loadhigh formworkpreassemblefloor support system