The central air conditioning chilled water system is widely used in the construction field,with high energy consumption,and energy-saving design becomes the hot spot.In practical projects,the system operation efficiency can be improved and energy consumption can be reduced by design optimization,equipment selection and control strategy,which is of great significance for promoting building energy conservation and emission reduction.The purpose of this paper is to discuss the key technologies of energy-saving design of central air-conditioning chilled water system and evaluate the implementation effect,so as to provide practical reference for energy-saving design of central air-conditioning chilled water system.
关键词
中央空调/冷冻水系统/节能设计
Key words
central air conditioning/chilled water system/energy-saving design