The construction quality supervision of transformer substation civil engineering is the key link to ensure the quality of the project.Through supervision and control,quality problems in the construction process can be found and corrected in time to prevent the occurrence of quality hazards.This paper focuses on the analysis of control points of transformer substation civil engineering construction quality supervision,covering the key links such as pre-construction preparation,construction process monitoring and post-construction acceptance.Through in-depth discussion of the importance of supervision work in construction quality control,targeted supervision measures and methods are proposed,aiming to ensure the construction quality of transformer substation civil engineering and provide a solid foundation for the safe and stable operation of electric power system.
关键词
变电站/土建工程/施工质量/监理控制/要点分析
Key words
transformer substation/civil engineering/construction quality/supervision and control/key points analysis