首页|变电站土建工程施工质量监理控制要点分析

变电站土建工程施工质量监理控制要点分析

扫码查看
变电站土建工程施工质量监理是确保工程质量的关键环节.通过监理控制,可以及时发现并纠正施工过程中的质量问题,防止质量隐患的产生.本文着重分析了变电站土建工程施工质量监理的控制要点,涵盖了施工前准备、施工过程监控以及施工后验收等关键环节.通过深入探讨监理工作在施工质量控制中的重要性,提出了针对性的监理措施和方法,旨在确保变电站土建工程的施工质量,为电力系统的安全稳定运行提供坚实基础.
Analysis on Key Points of Transformer Substation Civil Engineering Construction Quality Supervision and Control
The construction quality supervision of transformer substation civil engineering is the key link to ensure the quality of the project.Through supervision and control,quality problems in the construction process can be found and corrected in time to prevent the occurrence of quality hazards.This paper focuses on the analysis of control points of transformer substation civil engineering construction quality supervision,covering the key links such as pre-construction preparation,construction process monitoring and post-construction acceptance.Through in-depth discussion of the importance of supervision work in construction quality control,targeted supervision measures and methods are proposed,aiming to ensure the construction quality of transformer substation civil engineering and provide a solid foundation for the safe and stable operation of electric power system.

transformer substationcivil engineeringconstruction qualitysupervision and controlkey points analysis

董宁、许建

展开 >

国网江苏省电力有限公司宿迁供电分公司 江苏 宿迁 223800

变电站 土建工程 施工质量 监理控制 要点分析

2024

建筑与装饰

建筑与装饰

ISSN:
年,卷(期):2024.(20)