Research on Construction Technology of Large-Span Prestressed Hollow Floor of Fully Prefabricated Factory
Buildings 1-3 project in Pingshan New Energy Automobile Industrial Park adopts the design structure of steel frame structure+prestressed hollow slab+prefabricated exterior wall+prefabricated staircase,the main structure of each tower building has high story height,large span and heavy load,the project team and the company's technical team set up a special research team.Based on previous construction experience and prefabricated thinking,from the perspective of construction,the construction efficiency of large-span hollow floor is improved,the overall construction time of the whole floor is compressed,and the process quality level of hollow slab construction is improved.