首页|浅埋偏压隧道施工方案对比分析

浅埋偏压隧道施工方案对比分析

扫码查看
随着道路与基础设施建设的飞速发展,隧道工程在穿越复杂地形、克服高填深挖难题中发挥着越来越重要的作用.本文以雄孜隧道为例,分析不同开挖方案隧道位移的变化规律,发现先开挖的隧道因为变形时间长,拱顶下沉、拱底隆起均大一些,并提供了现场施工建议,为此类的浅埋偏压隧道的建设提供参考.
Comparative Analysis of Shallow-Buried Unsymmetrically-Loaded Tunnel Construction Scheme
With the rapid development of road and infrastructure construction,tunnel engineering plays an increasingly important role in passing through complex terrain and overcoming the problems of high fill and deep excavation.Taking the Xiongzi Tunnel as an example,this paper analyzes the change law of tunnel displacement under different excavation schemes,and finds that the tunnel that is excavated first has a larger vault sinking and inverted arch uplift due to the long deformation time,and provides on-site construction suggestions to provide a reference for the construction of such shallow-buried unsymmetrically-loaded tunnels.

shallow-buried unsymmetrically-loadedtunnel constructiontunnel deformation

王凯

展开 >

中铁十五局集团第二工程有限公司 上海 200070

浅埋偏压 隧道施工 隧道变形

2024

建筑与装饰

建筑与装饰

ISSN:
年,卷(期):2024.(24)