Research on Control Survey Technology of Deep-Buried Long-Distance Shield Tunnel
With the acceleration of urbanization process,deep-buried long-distance shield tunnel engineering has gradually become the focus of urban infrastructure construction.Combined with specific projects,this paper focuses on the exploration of control survey technology of deep-buried long-distance shield tunnel,mainly delves into the engineering overview,preparation,GPS control network layout,gyrostatic orientation survey,holing-through and completion section survey,aiming to improve the construction accuracy and efficiency of shield tunnels.
deep-buried long-distance shield tunnelcontrol survey technologyGPS control networkgyrostatic orientationholing-through survey