Construction Technology of Fully Assembled Fish-Scale PC Exterior Wall Based on Modular Design
The outer envelope structure of Buildings 1-3 project of Pingshan New Energy Automobile Industrial Park adopts a fully assembled fish-scale PC exterior wall based on modular design,with the unique shape.Because of interlocking lap joint connection mode,it causes problems such as high installation accuracy requirements and great difficulty in embedded part positioning.In view of the characteristics of the fish-scale PC exterior wall,the design,construction and prefabricated component factories jointly collaborate to plan the whole life cycle process from deepening drawings to on-site installation,ensure the safety,rationality,aesthetics and accuracy of the whole process,and realize the overall appearance design effect of the building facade.
EPC general contractingfish-scalePCprefabricated exterior wallinterlocking lap joint