Discussion on Optimization of Pipe Gallery Tunnel Construction Technology in Complex Geological Conditions
With the rapid development of urban infrastructure,pipe gallery tunnel,as an important public facility,plays a key role in the utilization of urban underground space.However,in complex geological conditions,the construction of pipe gallery tunnels faces many challenges,such as high groundwater level,loose earthiness,and staggered rock layers.By analyzing a number of practical project cases,this paper discusses the optimization methods of construction technology in these complex geological conditions,including advanced geological prediction technology,real-time adjustment of construction parameters,and application of new materials.Through the implementation of these optimization measures,construction safety,project quality and economic benefits can be effectively improved.