In order to find out the unfavorable geological structure in the design line of Luanchuan-Lushi Expressway,two CSAMT exploration lines are deployed.After data analysis and research,22 geological anomalies and 6 faults are inferred.The drilling verification shows the reliability and accuracy of the geo-physical exploration results.It provides reference for similar engineering problems.
CSAMTexpresswaypreliminary designadverse geological body