My company operating life of boiler no.5,and 6 coal pulverizer is lower,higher cost,lower reliability,and pose great influence to load problem,to solve the above problems,after extensive research,installed on the boiler no.5 C coal mill trial Xwin ? metal ceramic roller shell and lining board.At present,the boiler no.5 C coal mill has run more than 6 months,this report to Xwin ? metal ceramic roller shell and lining board trial condition are analyzed,and demonstrated the feasibility of the use and improvement Suggestions are put forward.
Coal mill fan air volume low lXwin ? metal ceramic roller shell andlining board promotion use