锡乌铁路风沙路基施工技术
Xi Wu Rail wayWind Sand Subgrade Construction
摘要
根据新建锡林浩特至乌兰浩特铁路土建一标DK137+096-DK171+000段风沙路基施工实例,对风沙危害及风沙路基特点进行分析描述,并总结了风沙路基的填筑工序和施工工艺。
Abstract
According to the new railway civil Wulanhaote Xilinhot to a section labeled DK137 +096- DK171 +000 Wind Sand Subgrade construction case, on Sand Subgrade sand and wind hazards analysis of the characteristics described, and summarized the wind Sand Subgrad
关键词
风沙路基/风沙危害/填筑工序/施工工艺Key words
Wind sand subgrade/Wind damage/Filling process/Construction technology引用本文复制引用
出版年
2011