Design of the Disassembly and Assembly Process for the CW10 Bogie of Light Rail Vehicles
The bogie is the running part of rail vehicles and one of the most important parts in the structure compo-sition of rail vehicles.The bogie needs to be maintained regularly during the operation of rail vehicles.and the rea-sonable formulation of the disassembly and assembly process for bogies directly affects their assembly quality,which determines the stability and ride comfort of vehicles.Based on a brief introduction to the function,composition and basic parameters of the CW10 bogie of light rail vehicles,this paper focus on basic technical requirements for the in-stallation of bogies,and designs the mechanical disassembly and assembly process.
Light rail vehicleBogieDisassembly and assembly processesMechanical parts