Assembly of Prefabricated Bridge Pier Studs and Their Reinforced Joint Sleeve Grouting Construction Technology
With the development of engineering construction technologies,prefabricated construction has gradually become an important construction method in engineering construction.The prefabricated construction of bridge construction has also been widely applied in practical engineering construction.This paper focuses on the construc-tion technology of hoisting prefabricated bridge pier studs and the grouting technology of connecting the pier stud and the cushion cap,analyzes the concerns of reinforced connecting sleeve grouting during construction,and puts forward corresponding solutions to difficult problems such as the control of the compactness of the seat grouting layer and the grouting compactness of the grouting sleeve,which provides references for similar engineering con-struction in the future through summary.