Loading,Unloading and Installation Technologies for Large Offshore Structures
The loading,unloading and installation technology of large offshore structures is an important part of ma-rine engineering.However,due to the complex environment,high operational difficulty and high safety require-ments of offshore engineering,there are still many problems and challenges in the existing loading,unloading and installation technology.In response to this deficiency,this study introduces a new intelligent measurement and con-trol system for parameter control,so as to improve the safety and efficiency of the loading and unloading process.Experimental results show that the average water level of ballast tanks generated by transverse and longitudinal incli-nation angles in the floating control of the barge in the traditional measurement and control system is 1.34 and 0.92,respectively,and the average height difference of the barge is 1.19,and that in the intelligent measurement and con-trol system,the average water level of ballast tanks generated by the transverse and longitudinal inclination angles of the barge is reduced to 1.08 and 0.81,and the average height difference of the barge is reduced to 0.98.The intelli-gent measurement and control system designed in this study has significantly improved the floating stability of barges and enhanced the stability of barges during loading and unloading,which is of practical significance for improving the safety and efficiency of the loading and unloading process of large offshore structures.
Large structureFloating control of bargesIntelligent measurement and control systemLoading and unloading technologyLoading and unloading adjustment