首页|市政给排水工程的长距离顶管施工技术分析

市政给排水工程的长距离顶管施工技术分析

扫码查看
随着城市基础建设的日益完善,为了满足城市建设与发展的需求,市政给排水工程项目逐渐增多.长距离顶管技术可以有效降低挖土量,节约施工用地,在施工中逐渐替代了传统的埋管技术手段.长距离顶管技术的应用可以有效提高施工质量,降低对环境的干扰与影响,是一种现代化的技术手段.分析市政给排水工程的长距离顶管施工技术,了解关键技术与工艺手段,可以有效提高施工综合质量.基于此,主要分析了市政给排水工程的长距离顶管施工技术要点.
Analysis of Long-Distance Pipe-Jacking Construction Technology for Municipal Water Supply and Drainage Engineering
With the increasing improvement of urban infrastructure,in order to meet the needs of urban construc-tion and development,municipal water supply and drainage engineering projects are gradually increasing.Long-distance pipe-jacking technology can effectively reduce excavation volume and save construction land,and it has gradually replaced the traditional pipe-laying technological means during construction.The application of long-distance pipe-jacking technology can effectively improve construction quality and efficiency and reduce interfer-ence and impacts on the environment,and it is a modern technological means.Analyzing the long-distance pipe-jacking construction technology of municipal water supply and drainage engineering and understanding its key tech-nologies and process methods can effectively improve the comprehensive quality of construction.Based on this,the article mainly analyzes the key points of long-distance pipe-jacking construction technology for municipal water supply and drainage engineering.

Municipal water supply and drainage engineeringLong-distance pipe-jacking constructionDevia-tion correcting technologySurface subsidenceMonitoring and measurement

李彬、李奕君、黄鹏飞、李铁军、蒋皓月

展开 >

中国市政工程中南设计研究总院有限公司 湖北武汉 430010

市政给排水工程 长距离顶管施工 纠偏技术 地表沉降 监控测量

2024

科技资讯
北京国际科技服务中心 北京合作创新国际科技服务中心

科技资讯

影响因子:0.51
ISSN:1672-3791
年,卷(期):2024.22(11)
  • 4