Research on the Key and Difficult Points of Materials and Structural Design for Permanent and Temporary Combined Pavement
In order to solve the structural problems of permanent and temporary road surfaces in current construc-tion projects,effectively control project construction cycles,and reduce project investment costs,a permanent and temporary road surface structure design scheme is proposed.This permanent and temporary combined road surface has significant advantages in saving construction time and costs.It is an ideal road surface structure selection scheme in the current high turnover development mode of real estate.The key and difficult issues of permanent and tempo-rary combined road surface materials and structural design will be discussed in combination with specific engineer-ing projects,for reference by relevant personnel.
Combination of permanent and temporaryReflection cracksTransition layerHigh turnover