人防工程机电安装中预留预埋施工技术研究

扫码查看
为进一步提高人防机电安装预留预埋质量、提高机电安装质量和验收通过率,围绕人防机电安装工程进行研究.结合当前预留预埋施工技术难点及人防机电安装工程施工特征,系统地阐述给排水、通风、电气专业的预留预埋施工技术要点,明确关键工序的操作方法.通过上述方法的实施,有利于制订科学的人防机电预留预埋施工方案,从根源上预防施工问题的产生.
Research on Reservation and Embedment Construction Technology in Mechanical and Electrical Installation of Civil Defense Engineering
In order to further improve the quality of reservation and embedment in civil defense mechanical and electrical installation,and to improve the quality and acceptance rate of mechanical and electrical installation,re-search is conducted around the civil defense mechanical and electrical installation engineering.Combined with the current difficulties in reservation and embedment construction technology and the construction characteristics of civil defense mechanical and electrical installation engineering,this paper systematically elaborates on the key points of reservation and embedment construction technology for water supply and drainage,ventilation,and electrical spe-cialties,and clarifies the operation methods of key processes.The implementation of the above methods is condu-cive to formulating a scientific reservation and embedment construction plan for civil defense mechanical and elec-trical installation,and preventing construction problems from the root.

Civil defense engineeringMechanical and electrical installationReservation and embedmentCon-struction technology

蔡培丰

展开 >

保利长大工程有限公司 广东广州 510640

人防工程 机电安装 预留预埋 施工技术

2024

科技资讯
北京国际科技服务中心 北京合作创新国际科技服务中心

科技资讯

影响因子:0.51
ISSN:1672-3791
年,卷(期):2024.22(19)