Analysis of Construction Technology and Crack Control Measures for Large Volume Concrete in Power Plants—Taking Domestic Waste Incineration Power Plant Project in Qingcheng District in Qingyuan City as an Example
This study takes the Qingcheng District Municipal Solid Waste Incineration Power lant project in Qin-gcheng District,Qingyuan City as an example to analyze the construction technology and crack control measures of large volume concrete in power plants,and evaluate the feasibility and effectiveness of the concrete construction technology and crack control measures of the project.This study used methods such as Field Research and Litera-ture Analysis to conduct a detailed investigation and observation of the concrete construction technology and crack control measures of the Qingcheng District Municipal Solid Waste Incineration Power Plant project in Qingyuan City,and found that large volume concrete construction technology is relatively advanced and can meet the needs of the power plant.In terms of crack control,the project has taken reasonable measures to effectively control the oc-currence of concrete cracks.By adopting large volume concrete construction technology and reasonable crack con-trol measures,the structural safety and long-term stable operation of the power plant can be ensured.
Power plantLarge volume concrete constructionConstruction technologyCrack control