Discussion on High Pier Technology of Road and Bridge Engineering
With the continuous development of social economy and the continuous improvement of traffic net-work,the construction of highway bridge has become one of the important symbols of urban development.In or-der to ensure the overall stability of road and bridge engineering,it is necessary to ensure the construction quality of engineering high pier.Taking actual engineering as an example,this paper explores the construction technology of high piers in road and bridge engineering.According to the actual situation of the project,formwork-turnover con-struction technology is selected for high pier construction,and the key process construction is completed according to the construction standard.The total station is used to test the construction results,and the maximum value of the verticality of the side line of the pier is 16.6mm,which meets the construction standard.
Road and bridge engineeringHigh pier construction technologyFormwork-turnover constructionHollow pier formwork