隧道渗水涌水及其处置技术分析

Analysis of Tunnel Water Seepage and Gushing and Their Disposal Technology

江国丁
科技资讯2024,Vol.22Issue(23) :162-164.DOI:10.16661/j.cnki.1672-3791.2409-5042-5346

隧道渗水涌水及其处置技术分析

Analysis of Tunnel Water Seepage and Gushing and Their Disposal Technology

江国丁1
扫码查看

作者信息

  • 1. 温州市交通工程管理中心 浙江 温州 325000
  • 折叠

摘要

针对某隧道施工中遇到的局部渗水和富水层涌水问题,通过地质勘察与水文分析、技术方案设计与实施以及实地监测渗水涌水情况,提出并验证了全断面超前帷幕注浆加固技术的效果与应用价值.验证结果发现,全断面超前帷幕注浆加固技术能够有效形成连续、致密的注浆帷幕,显著降低地下水渗透系数,有效阻断地下水渗出和涌出,为隧道开挖创造了良好的作业条件.

Abstract

In response to the problems of local water seepage and water-rich layer water gushing encountered dur-ing the construction of a certain tunnel,the effectiveness and application value of the full-section advanced curtain grouting reinforcement technology are proposed and verified through geological exploration and hydrological analy-sis,technical scheme design and implementation,and on-site monitoring of water seepage and gushing.The results show that the full section advanced curtain grouting reinforcement technology can effectively form a continuous and dense grout curtain,significantly reduce the groundwater permeability coefficient,effectively block groundwa-ter seepage and gushing,and create a good working condition for tunnel excavation.

关键词

渗水/涌水/隧道/全断面超前帷幕注浆

Key words

Water seepage/Water gushing/Tunnel/Full-section advanced curtain grouting