首页|高山风电场道路与市政道路的设计方法比较与应用研究

高山风电场道路与市政道路的设计方法比较与应用研究

扫码查看
随着可再生能源在全球范围内受到重视,高山风电场的建设势在必行.高山地形复杂、生态环境脆弱,因此,在设计风电场相关道路时,尤其需要考虑其对环境的影响及施工的可行性.在传统的市政道路设计方法中,通常通过平坦地形的标准化流程进行设计;高山风电场的道路设计则更需要考虑山地的独特性.基于此,简要分析了高山风电场道路设计的特点与难点,并对其道路设计的技术标准和方法进行了深入研究,由此引申出了高山风电场道路设计与市政道路在横截面设计方面的异同.
Research on Comparison and Application of Design Method of Alpine Wind Farm Road and Municipal Road
With the increasing emphasis on renewable energy worldwide,the construction of alpine wind farm is imperative.The alpine terrain is complex and the ecological environment is fragile.Therefore,when designing the related road of wind farms,it is particularly important to consider the impact on the environment and the feasibility of construction.In traditional municipal road design,the design is usually conducted through the standardized pro-cess of flat terrain,while the road design of alpine wind farms needs to combine the unique requirements of moun-tain characteristics.Based on this,this paper briefly analyzes the characteristics and difficulties of road design of al-pine wind farm,and deeply studies the technical standards and methods of road design,so as to extend the similari-ties and differences between road design of alpine wind farm and municipal road in cross section design.

Alpine wind farmMunicipal roadsHorizontal curve indexWidening value of planar curve bends

邓群、赵亚伟

展开 >

国家电投集团江西电力有限公司新能源发电分公司 江西 南昌 330096

高山风电场 市政道路 平曲线指标 平面曲线弯道加宽值

2024

科技资讯
北京国际科技服务中心 北京合作创新国际科技服务中心

科技资讯

影响因子:0.51
ISSN:1672-3791
年,卷(期):2024.22(23)